Avana – Freeman Construction Miami Avana – Freeman Construction Miami
Freeman Construction Miami

Office Address

11970 SW 64 St

Phone Number

786-550-6676

Email Address

info@freemancontractormiami.com

Licenses

Professional Engineering PE

PE # 66341 CA #31044

Verify License

General Contractor License

CGC 1532017

Verify License

Electrical Contractor License

EC 13007927

Verify License

Plumbing Contractor License

CFC 1429863

Verify License

Mechanical Contractor License

CAC 1819129

Verify License

Roofing Contractor License

CCC 1333615

Verify License

Project Information

Clients:

AVANA

Category:

Multiple Office Space Remodeling

Date:

15 February, 2023

Address:

8700 W Flagler St Suite 250, Miami, FL 33174

Full Facility Solution

Professional Construction/Sourcing Work

Freeman Contractor Miami proudly delivered the full furnishing and complete interior/exterior remodeling of the Avana Plastic Surgery Center, transforming the facility into a modern, fully compliant medical environment built for safety, efficiency, and patient comfort. Our team handled every detail—from custom cabinetry, reception and lobby furnishings, lighting systems, flooring, wall treatments, and surgical-suite finishes to high-grade medical equipment installation such as exam tables, procedure lighting, sterilization stations, storage systems, and patient-care fixtures. Every selection, layout, and material was chosen to meet healthcare standards while elevating the center’s aesthetic, ensuring a seamless blend of function, comfort, and visual appeal across all public, clinical, and administrative spaces.

Beyond the interiors, our firm executed a complete exterior makeover, including façade improvements, exterior lighting, accessibility upgrades, and compliant egress pathways. Throughout the project, we maintained strict adherence to Miami-Dade building regulations, medical facility codes, electrical and mechanical compliance, ADA standards, and all required safety protocols for a surgical-use property. From permitting to final inspection, Freeman Contractor Miami ensured the Avana Plastic Surgery Center was delivered as a fully operational, code-ready facility equipped with the furnishings, medical-grade components, and structural upgrades necessary to support safe, efficient, and professional healthcare operations.

This project stands as a reflection of our firm’s commitment to precision, innovation, and craftsmanship in specialized commercial construction. By coordinating directly with architects, medical planners, and regulatory inspectors, we ensured every phase met or exceeded the expectations of both the client and governing agencies. The Avana Plastic Surgery Center now serves as a benchmark of quality healthcare construction in Miami—where design, compliance, and patient experience come together through the dedication and expertise of Freeman Contractor Miami.

AVANA Project

img
img
img
img
img
img
img
img

The Challenge Of Project

The renovation and full furnishing of the Avana Plastic Surgery Center presented several unique challenges that required strategic planning, precise execution, and continuous coordination with medical professionals and regulatory teams. These key challenges shaped our approach and ensured the final facility met the highest standards of safety, functionality, and compliance:

  • Strict Medical Code & Compliance Requirements: Meeting Miami-Dade healthcare construction standards, surgical-suite regulations, ADA accessibility rules, and medical equipment installation codes required extensive coordination with inspectors and specialized consultants to ensure full approval at every stage.
  • Complex Coordination of Medical Furnishings & Equipment: Integrating surgical lighting, sterilization units, exam tables, plumbing-integrated fixtures, and specialty electrical systems into a redesigned space demanded precise planning, reinforced infrastructure, and collaboration with multiple medical vendors.
  • Maintaining Operational Efficiency During Construction: The facility needed to transition from an outdated layout to a fully modernized surgical center without disrupting administrative operations. This required phased work, after-hours installations, and continuous communication to keep the project on schedule and minimize downtime.
  • High-End Aesthetic & Brand Alignment Requirements: The interior build-out needed to reflect Avana’s upscale brand identity, requiring custom finishes, seamless material transitions, refined lighting design, and precise detailing to create a calming, luxury-focused environment for patients.
  • Advanced Mechanical & Environmental Controls: Surgical and recovery areas required specialized HVAC zoning, temperature control, and air filtration systems to support patient comfort, equipment performance, and clinical standards throughout the facility.
  • Patient Privacy & Workflow Optimization: The redesigned layout was carefully planned to improve patient flow, enhance privacy between consultation, prep, and recovery areas, and support efficient staff movement without compromising discretion or comfort.
  • Phased Construction Within an Active Medical Facility: Portions of the build-out were executed while other areas remained in use, requiring strict containment measures, dust control systems, and carefully sequenced work schedules to maintain a clean, compliant, and safe clinical environment at all times.
  • Precision Integration of Structural & Architectural Elements: Modifications to walls, ceilings, and framing were required to support new equipment loads, concealed utilities, and architectural features, demanding close coordination between structural work, engineering requirements, and final aesthetic finishes.

Ready to work with
our team?

Leading Developer Of Commercial & Residential Projects

shape