Avana Plastic Surgery
Project Information
Multiple Office Space Remodeling
15 February, 2023
8700 W Flagler St Suite 250, Miami, FL 33174
Full Facility Solution
Professional Construction/Sourcing Work
Freeman Contractor Miami proudly delivered the full furnishing and complete interior/exterior remodeling of the Avana Plastic Surgery Center, transforming the facility into a modern, fully compliant medical environment built for safety, efficiency, and patient comfort. Our team handled every detail—from custom cabinetry, reception and lobby furnishings, lighting systems, flooring, wall treatments, and surgical-suite finishes to high-grade medical equipment installation such as exam tables, procedure lighting, sterilization stations, storage systems, and patient-care fixtures. Every selection, layout, and material was chosen to meet healthcare standards while elevating the center’s aesthetic, ensuring a seamless blend of function, comfort, and visual appeal across all public, clinical, and administrative spaces.
Beyond the interiors, our firm executed a complete exterior makeover, including façade improvements, exterior lighting, accessibility upgrades, and compliant egress pathways. Throughout the project, we maintained strict adherence to Miami-Dade building regulations, medical facility codes, electrical and mechanical compliance, ADA standards, and all required safety protocols for a surgical-use property. From permitting to final inspection, Freeman Contractor Miami ensured the Avana Plastic Surgery Center was delivered as a fully operational, code-ready facility equipped with the furnishings, medical-grade components, and structural upgrades necessary to support safe, efficient, and professional healthcare operations.
This project stands as a reflection of our firm’s commitment to precision, innovation, and craftsmanship in specialized commercial construction. By coordinating directly with architects, medical planners, and regulatory inspectors, we ensured every phase met or exceeded the expectations of both the client and governing agencies. The Avana Plastic Surgery Center now serves as a benchmark of quality healthcare construction in Miami—where design, compliance, and patient experience come together through the dedication and expertise of Freeman Contractor Miami.
The Challenge Of Project
The renovation and full furnishing of the Avana Plastic Surgery Center presented several unique challenges that required strategic planning, precise execution, and continuous coordination with medical professionals and regulatory teams. These key challenges shaped our approach and ensured the final facility met the highest standards of safety, functionality, and compliance:

- Strict Medical Code & Compliance Requirements: Meeting Miami-Dade healthcare construction standards, surgical-suite regulations, ADA accessibility rules, and medical equipment installation codes required extensive coordination with inspectors and specialized consultants to ensure full approval at every stage.
- Complex Coordination of Medical Furnishings & Equipment: Integrating surgical lighting, sterilization units, exam tables, plumbing-integrated fixtures, and specialty electrical systems into a redesigned space demanded precise planning, reinforced infrastructure, and collaboration with multiple medical vendors.
- Maintaining Operational Efficiency During Construction: The facility needed to transition from an outdated layout to a fully modernized surgical center without disrupting administrative operations. This required phased work, after-hours installations, and continuous communication to keep the project on schedule and minimize downtime.